See All Durability See All Reliability See All Analyse Simulation See All DAQ See All API Treiber See All Dienstprogramm See All Vibrationskontrolle See All Kalibrierung See All DAQ See All Handheld See All Industriell See All Power Analyzer See All Signalaufbereiter See All Akustik See All Strom und Spannung See All Weg See All Kraft See All Wägezellen See All Mehrkomponenten See All Druck See All Dehnung See All Dehnungsmessstreifen See All Temperatur See All Neigen See All Drehmoment See All Vibration See All Zubehör See All Steuerungen See All Messerreger See All Modalerreger See All Leistungsverstärker See All Shaker Systeme See All Testlösungen See All Aktoren See All Verbrennungsmotoren See All Betriebsfestigkeit See All eDrive See All Sensoren für Produktionstests See All Getriebe See All Turbolader See All Schulungskurse See All Akustik See All Anlagen- und Prozessüberwachung See All Elektrische Energie See All NVH See All Kundenspezifische OEM-Sensoren See All Strukturelle Integrität See All Schwingbelastung See All Automobil & Bodentransport See All Druckkalibrierung | Sensor | Messumformer See All Kalibrierung oder Reparatur anfordern See All Kalibrierung und Verifizierung See All Kalibrierung Plus Vertrag See All Brüel & Kjær Support
arrow_back_ios

Main Menu

See All Aqira See All nCode Viewer (DE) See All Weibull++ - NEW TEST (DE) See All Weibull++ - NEW TEST (DE) See All BlockSim - New Test (DE) See All BlockSim - New Test (DE) See All XFRACAS - New Test (DE) See All XFMEA - New Test (DE) See All XFMEA - New Test (DE) See All RCM++ - New Test (DE) See All RCM++ - New Test (DE) See All SEP - New Test (DE) See All SEP - New Test (DE) See All Lambda Predict - New Test (DE) See All Lambda Predict - New Test (DE) See All MPC - New Test (DE) See All nCode - Durability and Fatigue Analysis See All ReliaSoft - Reliability Analysis and Management See All API See All Elektroakustik See All Umgebungslärm See All Identifizierung der Lärmquelle See All Produkt-Lärm See All Schallleistung und Schalldruck See All Vorbeifahrgeräusche See All Produktionsprüfung und Qualitätssicherung See All Maschinenanalyse und -diagnose See All Strukturelle Gesundheitsüberwachung See All Strukturüberwachung See All Batterieprüfung See All Einführung in die Messung elektrischer Leistung bei transienten Vorgängen See All Transformator-Ersatzschaltbild | HBM See All OEM-Sensoren für die Landwirtschaft See All OEM-Sensoren für Robotik- und Drehmomentanwendungen See All OEM-Sensoren für die Agrarindustrie See All OEM-Sensoren für Robotik- und Drehmomentanwendungen See All Strukturelle Dynamik See All Prüfung der Materialeigenschaften See All Sicherstellung der strukturellen Integrität von Leichtbaustrukturen See All Elektrifizierung von Fahrzeugen See All Seiten, die nicht migriert wurden See All Software-Lizenzverwaltung

Markov Diagrams

What are Markov diagrams?

 

Markov diagrams allow you to model the behavior of a system in various states using a memoryless process, where the next state of the system is only dependent on the transition values and the current state of the system. This gives you the ability to look at partial or degraded working states, and to start analysis in varying states. Markov diagrams are available in ReliaSoft BlockSim software. If you have access to the Event Analysis module in BlockSim, you can analyze a Markov diagram during a simulation and use the analysis result in your RENO flowchart.

Using Markov Diagrams in ReliaSoft BlockSim for Reliability Analysis

 

With BlockSim, we will demonstrate an initial estimation analysis on the life cycle of a complex drilling system that starts off as brand new (100% initial probability in the full capacity state). The system has a probability to degrade into various states of capacity with time and can eventually enter a salvage state. There is also a probability of being returned to the as-good-as-new condition from each degraded state, except from the salvage state. The salvage state is considered to be a "sink," a state from which there are no transitions to any other state and therefore we have zero probability of leaving. We want to determine, on average, what percent of the time will be spent in each state over a 10-year period. To perform this type of analysis, we will use a discrete Markov diagram. Our initial setup looks like this:

We estimate the following probabilities per month to move between states:

  • 1% chance to degrade from 100% to 80% capacity
  • 10% chance to be restored from 80% to 100% capacity
  • 3% chance to degrade from 80% to 60% capacity
  • 8% chance to be restored from 60% to 100% capacity
  • 6% chance to degrade from 60% to 40% capacity
  • 5% chance to be restored from 40% to 100% capacity
  • 8% chance to degrade from 40% capacity to salvage

Based on these percentages, the final diagram that is ready for analysis looks like this:

Since our estimated probabilities are on a month scale, we will take each step of the analysis to be the equivalent of one month. This means that we will run our calculation for 120 steps. After we calculate the diagram, we can see that the transition probability matrix between the states looks like this (which we can easily use to verify our inputs):

Full Diagram
FROM -> TO 100% capacity 80% capacity 60% capacity 40% capacity Salvage
100% capacity 0.99 0.01 0 0 0
80% capacity 0.1 0.87 0.03 0 0
60% capacity 0.08 0 0.86 0.06 0
40% capacity 0.05 0 0 0.87 0.08
Salvage 0 0 0 0 1
We can use the state point probability plot to see if our system has reached steady state within our time frame.

In this case study example, because we have a "sink" state, we do not reach steady state, where all the probabilities have reached a constant value, but rather a pseudo-steady state where the probabilities are changing at a roughly constant rate.

 

Afterwards, we can check the results summary to determine the mean probabilities in each state and the point probabilities after 120 steps (10 years).

Results After 120 Steps
State name Initial probability Mean probability Point probability Steps spent in state
100% capacity 1 0.894127 0.859252 107.295203
80% capacity 0 0.064845 0.066382 7.781451
60% capacity 0 0.013046 0.014282 1.565469
40% capacity 0 0.005597 0.00662 0.671615
Salvage 0 0.022386 0.053464 2.686261

Conclusions

 

From the results we can conclude that the majority of the time (89.4%) our system should be running at 100% capacity and that after the 10-year period there is about a 5.3% chance that the system will degrade to a point from which it cannot be restored (the salvage state).