It was an extremely short time window: Only five days were allowed for static and dynamic load tests on a new bridge across the Nitra river to be conducted by the Czech company SHP.
This meant: Two teams performed measurements and tests 24/7. SHP was able to provide its contractor with a detailed analysis already the very next day. One of the secrets behind the success: utilization of HBK's QuantumX data acquisition system for measurement.
Motorways and expressways are the backbone of a country's economic success. For this reason, the Czech Republic has continually invested in the development of national primary routes since the political change in 1989. With success: The motorway and expressway network has since doubled to over 1,000 kilometers.
However, there's more to it than expansion: For quite some time, the Czech state as a contractor has paid attention to low, predictable costs and short construction periods in road construction - at the same time ensuring compliance with all relevant safety standards.
Therefore, significant static and dynamic load tests are a must prior to opening a bridge to traffic.