A 1:20 scale model of the new bridge type was built and fitted with type
KMR force washers in May 2013. This model was used to carry through different tests regarding assembly and operation. Since in this case the measurements were only taken to
verify the FEM results,
cost-effective miniature force washers could be used.
The original-size bridge was installed in a gravel plant in late July 2013. It is made of steel and stabilized by four pre-stressed wire ropes.
C6A force transducers from HBM each with
1000 kN measuring range were installed in all of the four ropes for
monitoring of the pre-stressing force during assembly and operation. Type
AE301 industrial amplifiers were used for
evaluation. Jakob Baader, Senior Project Engineer at Bitterli+Partner Ingenieure AG says: "HBM offers a very
attractive price-performance ratio and products that can also be used in harsh environments."
The measurements were highly reliable and stable. A vibration damper optimally adapted to the bridge will now be developed based on the acquired measurement data.