Principle of total synchronization for maximum production efficiency
To increase production efficiency, Bühler introduced the “Total Synchro” principle, which is also known as "continuous production". The transport paths and thus the processing time are greatly reduced, the flow of commodities is decentralized and the value creation process is optimized. This also includes regular checks on suppliers with regard to reliability, adherence to delivery dates and performance. HBM easily satisfied all the criteria and, in 2011, was identified by Bühler as a 'preferred supplier'.
HBM: a global setup with local contacts
With factories in China, Germany and the USA, HBM Test and Measurement is a reliable partner for globally active customers. The global distribution of production allows HBM load cells to be delivered promptly and in accordance with different customer requirements. Whether small or large batches, standard products or custom-made measuring bodies, hundreds of customers throughout the world put their trust in HBM in their supply chain with regard to flexibility, quality, delivery performance and not least price. With technically competent contacts in more than 80 countries, the customer is always close at hand, and the "good relationship" maintained.